Current Bid List

We will list new projects on this page as they become available, please check back soon.

SCOPE OF WORK: The work is located at the Falling Creek Reservoir, 4720 Iron Bridge Road, North Chesterfield, VA 23234. The work includes, but is not limited to removal, handling, transportation and disposal of a minimum of 119,000 cubic yards of sediment from Falling Creek Reservoir, construction of a submerged forebay berm, construction of temporary staging and support areas, construction of temporary and permanent access roads, clearing and grubbing of existing lands, grading and construction of stabilized embankments, demolition of existing marine structures and underground facilities, erosion and sediment control measures for protection of the site throughout construction and final stabilization and restoration of disturbed areas as shown and specified.

SUBCONTRACTORS: (required if not a supplier)
AsphaltConcrete / Flowable FillCraneElectricalHaulingErosion and Sediment ControlLandscapingPavement MarkingSurveyTestingTraffic ControlTree RemovalUtilities ContractorsOther (Use text box below)

SUPPLIER: (required if not a subcontractor)
BridgesComposite ProductsConcreteErosion and Sediment ControlFence / RailingFloating Dock / GangwayGuardrailHardwareLumber and PileMarine SuppliesPrecastRebar / GalvanizingSheetpileSteel ProductsStone / Sand / TopsoilSignageOther (Use text box below)

Scope of Work: The work under this project consists of demolition of the existing boardwalk and replacement with a boardwalk of similar dimensions and location.

SUBCONTRACTORS: (required if not a supplier)
AsphaltConcrete / Flowable FillCraneElectricalHaulingErosion and Sediment ControlLandscapingPavement MarkingSurveyTestingTraffic ControlTree RemovalUtilities ContractorsOther (Use text box below)

SUPPLIER: (required if not a subcontractor)
BridgesComposite ProductsConcreteErosion and Sediment ControlFence / RailingFloating Dock / GangwayGuardrailHardwareLumber and PileMarine SuppliesPrecastRebar / GalvanizingSheetpileSteel ProductsStone / Sand / TopsoilSignageOther (Use text box below)

SCOPE OF WORK: Repair a storm water management basin on Route 704, Battery Park Road, in
Smithfield, Virginia.

SUBCONTRACTORS: (required if not a supplier)
AsphaltConcrete / Flowable FillCraneElectricalHaulingErosion and Sediment ControlLandscapingPavement MarkingSurveyTestingTraffic ControlTree RemovalUtilities ContractorsOther (Use text box below)

SUPPLIER: (required if not a subcontractor)
BridgesComposite ProductsConcreteErosion and Sediment ControlFence / RailingFloating Dock / GangwayGuardrailHardwareLumber and PileMarine SuppliesPrecastRebar / GalvanizingSheetpileSteel ProductsStone / Sand / TopsoilSignageOther (Use text box below)

[recaptcha]

Scope of work: This project consists of construction of level 1 wet pond in the Hampton River West & Southampton watershed to increase stormwater flood storage, provide additional storage to offset future site development, and provide stormwater pollutant load reductions to the City of Hampton. The scope of the project includes, but not limited to, excavation, backfilling, installation of storm sewer systems, installation of helical piers, installation/removal of all necessary erosion and sediment control devices, marsh planting, plants and all other necessary items to properly complete the project.

SUBCONTRACTORS: (required if not a supplier)
AsphaltConcrete / Flowable FillCraneElectricalHaulingErosion and Sediment ControlLandscapingPavement MarkingSurveyTestingTraffic ControlTree RemovalUtilities ContractorsOther (Use text box below)

SUPPLIER: (required if not a subcontractor)
BridgesComposite ProductsConcreteErosion and Sediment ControlFence / RailingFloating Dock / GangwayGuardrailHardwareLumber and PileMarine SuppliesPrecastRebar / GalvanizingSheetpileSteel ProductsStone / Sand / TopsoilSignageOther (Use text box below)